Importance of CPM Scheduling in Construction.

Updated: Aug 8, 2018

In CPM Scheduling, the construction scheduler can use a systematic approach to planning and scheduling wherein to focus heavily on planning; relying on the competence of the experienced construction scheduler either to his/her engineering background. The CPM Schedule is developed using patterns and proven workflows reflecting best practice work processes throughout the entire project life time cycle. The CPM schedule is a critical component of a project controls system, as the schedule must be kept in a manageable level of detail to ensure its efficiency, and to remain an effective time management tool wherein capable of connecting itself to the vital project information accordingly.



There is no doubt that Primavera P6 is a great planning tool, however, it has some limitations regarding the allocation of large information into the time schedules. Construction Schedulers are advised to immerse themselves in every detail in the project. Every aspect can change how to deal with each activity, in which division shall it lie, and how to measure its progress. There is no optimal method for percent complete calculation as it depends on the available data and what output is sought to be achieved. However, It is vital to be familiar the options available, and in turn, select the most appropriate to address your scheduling needs.

11 views

© 2018/19 by Progrex PMC L.L.C. Proudly created by our Marketing Team

  • LinkedIn - White Circle
  • Twitter - White Circle
  • Yelp - White Circle