Experience / RFK Bridge Preservation
RFK Bridge Preservation
Estimated Value: $10M
Owner: MTA Bridges and Tunnels
General Contractor: AHERN Contractors
Scope and Description:
Repair of Utility Hanger Rods on suspension spans, spot painting for bridge steel, scupper cleanout, median barrier maintenance, and anchorage cleaning.
The three ramps are the 125th Street off-ramp, the 125th Street on-ramp, and the ramp to and from the FDR Drive.
Provided Services:
-
Project Management and Coordination
-
CPM Scheduling (Baseline + Updates)
-
Cost Loaded Schedule
-
Resource Loaded Schedule