Experience / YANBU MARAFIQ Seawater
YANBU MARAFIQ Seawater Cooling Pipeline Network.
Client: Power and Water Utility Company for Jubail and Yanbu (Marafiq)
Scope and Description:
The project includes the design, procurement, construction, testing and commissioning of a seawater cooling pipeline network.
Supply and return seawater cooling pipelines to and from Yanbu Industrial City II together with a spare supply/return pipeline. These pipelines (3 nos.) will each be approximate 5 Km in length and of equal diameter and to be laid in a common trench and will run in the Royal Commission Corridor. The mechanical works consist of valves including isolation (butterfly) valves, air valves and pressure reducing valves.
Provided Services:
-
Project Management Coordination (Master Schedule L2)